The sequence
- Site and drawings. One Season specs the configuration and provides install drawings, schedules, and scope before anyone mobilizes.
- Delivery and set. Prefabricated steel modules, roughly 20 by 25 feet each, arrive ready to set. Crews place, stack, and tie the structure together, then hang stairs and access platforms.
- Systems install. Vertical grow walls, lighting, and irrigation go in to layout drawings. HVAC and dehumidification are sized for a sealed growing environment. Electrical covers panels, circuits, and the sensor and controls package. Water is a closed recirculating system: tanks, dosing, drainage, leak-tested.
- Commissioning and handoff. Systems are tested, remote monitoring comes online, and the site is handed to the customer team One Season trains.
A One Season project is a package of familiar trade work, sequenced the same way on every site.
Which crews fit
Modular and prefab builders, HVAC and refrigeration contractors, electrical and solar installers, greenhouse and CEA builders, and commercial general trades. If that list sounds like your company, the gap between what you do now and what a One Season install needs is training, not reinvention.

What the training covers
Factory training on the structure, grow systems, and controls, followed by a supervised first install. Qualification depends on trade experience, licensing, and completed training. It is earned, not automatic, and that is deliberate: the network only works if every install is right.

